Case Study: Automotive Manufacturer
Situation:
- An automotive manufacturer in Alliston was challenged with aging sanitary drains that often leaked.
- The gang-trapped floor drains body were separating from the slab and continually leaking
- Each leak would effect the production line below and the shut down would cost thousands of dollars per occurrence.
- We stopped the leaks between slab and drain savings thousands of dollars
Benefits of NuDrain Technology:
- OPL lined 20 four foot sections over three days and sealed the drain and the slab eliminating the leak
- The customer is happy with the result that they continue to use OPL to line multiple drain during routine plant shutdowns.